OK, here we are in September of 2009 and I am starting to get ready for another southern journey. While I did not start early enough, I did however, start at the end of August, so hopefully we can be ready. The problem is: I have a lot of plans for this cruise. So here is what is going on:


Maintenance:

  • I had a mechanic do a routine checkup on my main motors and here is what we found so far:
  • The turbines need rebuilding – In Progress
  • The Impellers need to be replaced – Done
  • The Valves need adjusting – Done
  • The Starboard Motor needs a new exhaust Gasket – Done
  • Starboard Motor after-cooler to be cleaned – Done
  • Both Oil Pan Gaskets need replacing – Done
  • Major Field Day in the Bilge – In Progress
  • All Engine Hoses need replacing – Done
  • Generator Starter needs replaced – In Progress
  • Generator has heavy smoke under load – In Progress


Modifications/Improvements:

  • Bilge Area
    • Install Mirrors on outboard sides of the engines – Material bought, In progress
    • Update Bilge lighting – Not started
    • Relocate Oil Changer (which requires relocation of Generator Sea Strainer – In progress
    • Design and install Water Maker – Research only. There will be more posts on this one.
    • Design and install Scuba Tank compressor
    • Fix water intrusion from the transom locker
    • Organize poles in transom locker
    • Hook up STBD tank to generator
    • Organize storage
  • Salon and Interior
    • Replace Carpet – Not started
    • Replace wood flooring – not started
    • Mount TV/DVD in Master Stateroom
    • Install TV in Guest Stateroom
    • Design and install phone system
    • Possibly design/install cabinetry in "L" room
  • Cockpit Area
    • Relocate Water bib
    • Permanently install Water filter/softener
    • Install Tackle box
    • Create permanent line storage
    • Create Scuba Tank Holders (4)
    • Install subwoofer and amp
    • Design and have cockpit canopy installed
    • Teak flooring (as money allows)
  • Bridge/Helm
    • Redo fiberglass for helm
    • Design new CPU based navigation system
    • Install TV
    • Install SAT Data/VOX
    • Replace all speakers
    • Possible replacement of forward isinglass
    • Teak flooring (As money allows)

I am sure there are a lot more items but I thought I would start with a list now. As I complete each job, I will post articles and pictures to describe each trial and tribulation. I am starting the blog early to ensure that I have all the tools necessary to post. That way there should be no delay once we start. More to come later.