OK, here we are in September of 2009 and I am starting to get ready for another southern journey. While I did not start early enough, I did however, start at the end of August, so hopefully we can be ready. The problem is: I have a lot of plans for this cruise. So here is what is going on:
Maintenance:
- I had a mechanic do a routine checkup on my main motors and here is what we found so far:
- The turbines need rebuilding – In Progress
- The Impellers need to be replaced – Done
- The Valves need adjusting – Done
- The Starboard Motor needs a new exhaust Gasket – Done
- Starboard Motor after-cooler to be cleaned – Done
- Both Oil Pan Gaskets need replacing – Done
- Major Field Day in the Bilge – In Progress
- All Engine Hoses need replacing – Done
- Generator Starter needs replaced – In Progress
- Generator has heavy smoke under load – In Progress
Modifications/Improvements:
- Bilge Area
- Install Mirrors on outboard sides of the engines – Material bought, In progress
- Update Bilge lighting – Not started
- Relocate Oil Changer (which requires relocation of Generator Sea Strainer – In progress
- Design and install Water Maker – Research only. There will be more posts on this one.
- Design and install Scuba Tank compressor
- Fix water intrusion from the transom locker
- Organize poles in transom locker
- Hook up STBD tank to generator
- Organize storage
- Install Mirrors on outboard sides of the engines – Material bought, In progress
- Salon and Interior
- Replace Carpet – Not started
- Replace wood flooring – not started
- Mount TV/DVD in Master Stateroom
- Install TV in Guest Stateroom
- Design and install phone system
- Possibly design/install cabinetry in "L" room
- Replace Carpet – Not started
- Cockpit Area
- Relocate Water bib
- Permanently install Water filter/softener
- Install Tackle box
- Create permanent line storage
- Create Scuba Tank Holders (4)
- Install subwoofer and amp
- Design and have cockpit canopy installed
- Teak flooring (as money allows)
- Relocate Water bib
- Bridge/Helm
- Redo fiberglass for helm
- Design new CPU based navigation system
- Install TV
- Install SAT Data/VOX
- Replace all speakers
- Possible replacement of forward isinglass
- Teak flooring (As money allows)
- Redo fiberglass for helm
I am sure there are a lot more items but I thought I would start with a list now. As I complete each job, I will post articles and pictures to describe each trial and tribulation. I am starting the blog early to ensure that I have all the tools necessary to post. That way there should be no delay once we start. More to come later.