Showing posts with label cruise 2009. Show all posts
Showing posts with label cruise 2009. Show all posts

Thursday, September 10, 2009

The Preparations Begin

OK, here we are in September of 2009 and I am starting to get ready for another southern journey. While I did not start early enough, I did however, start at the end of August, so hopefully we can be ready. The problem is: I have a lot of plans for this cruise. So here is what is going on:


Maintenance:

  • I had a mechanic do a routine checkup on my main motors and here is what we found so far:
  • The turbines need rebuilding – In Progress
  • The Impellers need to be replaced – Done
  • The Valves need adjusting – Done
  • The Starboard Motor needs a new exhaust Gasket – Done
  • Starboard Motor after-cooler to be cleaned – Done
  • Both Oil Pan Gaskets need replacing – Done
  • Major Field Day in the Bilge – In Progress
  • All Engine Hoses need replacing – Done
  • Generator Starter needs replaced – In Progress
  • Generator has heavy smoke under load – In Progress


Modifications/Improvements:

  • Bilge Area
    • Install Mirrors on outboard sides of the engines – Material bought, In progress
    • Update Bilge lighting – Not started
    • Relocate Oil Changer (which requires relocation of Generator Sea Strainer – In progress
    • Design and install Water Maker – Research only. There will be more posts on this one.
    • Design and install Scuba Tank compressor
    • Fix water intrusion from the transom locker
    • Organize poles in transom locker
    • Hook up STBD tank to generator
    • Organize storage
  • Salon and Interior
    • Replace Carpet – Not started
    • Replace wood flooring – not started
    • Mount TV/DVD in Master Stateroom
    • Install TV in Guest Stateroom
    • Design and install phone system
    • Possibly design/install cabinetry in "L" room
  • Cockpit Area
    • Relocate Water bib
    • Permanently install Water filter/softener
    • Install Tackle box
    • Create permanent line storage
    • Create Scuba Tank Holders (4)
    • Install subwoofer and amp
    • Design and have cockpit canopy installed
    • Teak flooring (as money allows)
  • Bridge/Helm
    • Redo fiberglass for helm
    • Design new CPU based navigation system
    • Install TV
    • Install SAT Data/VOX
    • Replace all speakers
    • Possible replacement of forward isinglass
    • Teak flooring (As money allows)

I am sure there are a lot more items but I thought I would start with a list now. As I complete each job, I will post articles and pictures to describe each trial and tribulation. I am starting the blog early to ensure that I have all the tools necessary to post. That way there should be no delay once we start. More to come later.

briman